The process outlined below shows our Solar System Installation

The Site Evaluation

During the site evaluation our representative comes to your home to verify the planned system design. (For our process, if the scope of work has changed, the initial contract is void and amendments are made). The installer will check the roof and attic, the electrical setup, and battery placement (if applicable).

System Design Approval

At this point, results of the site evaluation have come back and any changes needed are now to be approved. If there were changes from the original design, the homeowner may now review those changes and give feedback, or approve the final design. Not only the aesthetics of the design are checked, but also the electrical work and system production.

Permit Approval

Permit approval is necessary so everyone installing a solar system is in accordance with safety codes (fire, electrical, and structural). We will send permitting documents, such as the design approved in the previous stage, to the city to be approved. There are fees attached to permit applications which vary based on city, however all permitting fees are already included in the total system cost.

Installation

Installation just takes a few days, usually one to two. You don’t necessarily even need to be home during installation. This is when you let our professional team do their job and you can sit back and relax. Note that your power will likely need to be turned off for a few hours.

Final Inspection

Once the installation is complete, the city inspector comes out to make sure that everything has been done in alignment with the scope of work that was permitted.